- FCC Reactor Overhead Line Vapor Isolation Valve - June 21st, 2017
- Upgrading a FCC Main Fractionator to Improve Operational Reliability and Flexibility - June 12th, 2017
- Integration of FCC Unit with Hydrocracker and Delayed Coker Units - June 12th, 2017
- Control Practice in FCC Operation: Philosophical Discussion and Looking into the Future - March 30th, 2017
- Safely Managing the FCCU Heat Balance with Varying Feed Qualities - March 30th, 2017
- FCC Overhead Isolation Valve and Safety - March 30th, 2017
- Reliability – A Path to Changing Unplanned Losses into Production Gains - March 21st, 2017
- The Most Likely Futures for US Refining - March 21st, 2017
- Issues to Consider Before Planning a 5 – 6 Year Run - March 20th, 2017
- Honoring the CatCracking Advisors - March 20th, 2017