Facilitator: Vahe Avetisyan – VVInEx
Overview
Testing of FCCU main Blower and Wet Gas compressor Control System is always a challenge as all tests and verifications at vendor premises are performed on Simulation mode, without actual compressor or Blower. VVInEx developed special dynamic modeling of the actual compressor based on the actual performance data. This allows more detailed and precise testing of the Control system prior to the delivery with less critical adjustments on site.
Fouling of Wet gas compressor and scheduling of cleaning / flushing is very important for refiner operations. Data analyzing system developed by VVInEx allows evaluation of fouling degree with further trend prediction and calculation of most economical cleaning / flushing time.