Delayed Coking
Delayed Coking
- Non-operator Tower of the Coker – Interlock and Automization
– Guenter Breuer & Dr. Asli Nau – BP Gelsenkirchen - Delayed Coker Feed Configuration and Technology Review
Stefan Jansen – CIRCOR | DeltaValve - Bottom of the Barrel Conversions: What Does the Future Hold?
– Nicola Knight – KBC (a Yokogawa Company) - Radiometric levels on Delayed Cokers – Lessons learned from recent startup
– David Williams – Berthold Technologies - Eliminating Shutdown Water Flushing on Large Process Units
– Daryl Crandall – Refined Technologies EU B.V. - Lift and turn metal seated plug valve reliability issues and resolution
– Dr. Ing. Matthias Ihlow – MIAM - Panaflow HT. Measure at extreme temperatures and reduce your expenses on shut downs, maintenance, and calibration
– Theodorus Bertels – Baker Hughes, a GE Company - Optimising crude desalters to ensure optimum FCCU and DCU performance
– Andrew Shaw – Tracerco Ltd. - Actuation and Control Systems for Petrochemical Process Valves: Best Practice and New Trends
– Alberto Pedrini – IMI Remosa - IMO 2020: Price Directions for Refining Products
– Esa Ramasamy – S&P Global Platts - Closed Coke Slurry System / Start Up Impressions from LOTOS
– Ralf Gast – TRIPLAN Technology & Adrian Szkudlarski – LOTOS - Incremental Value from FCC Catalyst Innovation
– Pedro Amador & Yelena Rojas Yoris – AZZ WSI B.V. - Reliability Ranking and Life Extension of Coke Drums
– Bobby Wright – Becht Engineering - Coking and Fouling on DCUs – Locations and Solutions
– Mitchell Moloney – Resid Upgrading Specialist and Engineering Consultant, PE - DCU Commissioning and Start-Up – Key Considerations
– Mitchell Moloney – Resid Upgrading Specialist and Engineering Consultant, PE
CatCracking
CatCracking
- FCCU Heartburn Panel
- Streamlining the FCC Shutdown Process
– Sjoerd Ypma – Refined Technologies EU B.V. - Improving Longevity and Quality in FCCU Refractory
– Wouter Garot – SILICON, Stef Breedveld – Goud, and other panelists - Optimising crude desalters to ensure optimum FCCU and DCU performance
– Andrew Shaw – Tracerco Ltd. - FCCU Revamps – Challenges, Opportunities, and Lessons Learned
– Subhash Singhal & Ahmed Al-Harbi – KNPC - Next Generation ZSM-5 Additives for Maximizing LPG Olefins from the FCC
– Rafael Gonzalez – GRACE - An Approach to Engineered Temporary Revamps
– Massimo Capra – Aggreko - In High Demand: Innovative Catalyst Technologies for Contaminant Metals and Ligh Olefins
– Stefano Riva – BASF - Bottom of the Barrel Conversions: What Does the Future Hold?
– Nicola Knight – KBC (a Yokogawa Company) - Preventative Maintenance and Turnarounds
– Roberto Cervellera – Tapco Enpro - Troubleshooting Refractory Problems
– Waldi Van Leeuwen – BP Refining Logistics Technology - Development on Catalytic Deactivation Study in Commercial RFCC Catalysts
– Abdulmajeed Al Katheeri – ADNOC Refining, Research Centre Division - Actuation and Control Systems for Petrochemical Process Valves: Best Practice and New Trends
– Alberto Pedrini – IMI Remosa - Utilization of FCC E-Cat Flushing to Control Metal Contamination and/or in Emergency Situations Caused by Cyclone Failure
– Florin Enache – Petrotel Lukoil - IMO 2020: Price Directions for Refining Products
– Esa Ramasamy – S&P Global Platts