- Gallery 2017 Galveston - June 5th, 2017
- The Ideal Coker – Redux - April 25th, 2017
- Realize Maximum DeltaValve Advantage – Minimize Unexpected Cost - April 25th, 2017
- Control Practice in FCC Operation: Philosophical Discussion and Looking into the Future - March 30th, 2017
- Safely Managing the FCCU Heat Balance with Varying Feed Qualities - March 30th, 2017
- FCC Overhead Isolation Valve and Safety - March 30th, 2017
- Reliability – A Path to Changing Unplanned Losses into Production Gains - March 21st, 2017
- Fatigue Life / Reliability Consideration during Field Repair of Coke Drum / Piping - March 21st, 2017
- The Most Likely Futures for US Refining - March 21st, 2017
- Issues to Consider Before Planning a 5 – 6 Year Run - March 20th, 2017