    Exxon Mobil Torrance Refinery Beginning Maintenance
    The following table lists planned and unplanned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and does not purport to be a comprehensive list.
    Exxon Mobil Corp. said Thursday that several process units at its refinery in Torrance, Calif., are slated to be shut down starting Friday for planned maintenance lasting several weeks.
    Valero Energy Corp. on Wednesday said its Meraux, La., refinery is expected to resume normal operating rates in about a week following planned maintenance at unspecified units that began sometime in April. The work included catalyst changeouts, the company said.
    Valero on Tuesday said it would spend about $500 million for new equipment at its refineries in Houston and Corpus Christi, Texas, to increase their light, sweet-crude refining capacity by a combined 160,000 barrels a day. The start and completion dates for the projects were not provided.
    Phillips 66 said Monday that an unspecified “process upset” at its 146,000 barrel-a-day refinery in Borger, Texas, resulted in sulfur dioxide and hydrogen sulfide being emitted. The company declined to say whether operations were effected.
    Chalmette Refining LLC said Monday that planned maintenance at its oil refinery in Chalmette, La., had been concluded over the weekend. Traders in the region said the plant’s key gasoline-producing fluid catalytic cracking unit and an associated alkylation unit were the focus of the work, but a company spokesman was unable to confirm.
    HollyFrontier said in an Monday filing that a unit at its refinery in El Dorado, Kan., had a power outage the previous day.
    Marathon Petroleum Corp. said Sunday its refinery in Detroit, Mich., was operating normally after a fire in a sour water tank the previous night.
    For more detailed information, search Dow Jones Newswires using the code N/REF.
    [pre]Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA CARIBBEAN EAST COAST GULF COAST Alon Krotz Springs 83.0 Minor fire at the plant’s re– USA LA former unit on April 25 brought under control within 11 minutes. Status of operations unclear; assessment on-going. Citgo Corpus 165.0 East Plant FCCU No. 1 and No. Corp. Christi, TX 2 rates back on line on April 26 after going into circulation mode on April 23 when water in the feed to the units caused emissions of excess opacity. Marathon Texas City, 475.0 Charge rate at FCCU 1 reduced on TX April 20 to reduce excess opaci- ty when associated equipment tripped off line, a filing to regulators said. Phillips Borger, 146.0 Upset at unspecified process unit 66 TX on April 29 reported to TCEQ. Co. declined to comment. Phillips Sweeny, 247.0 Rates reduced on April 19 when 66 TX transformer snag shut crude unit No. 25. FCCU No. 27 resumed nor- mal service after de-energizing during the crude unit event, a filing to regulators said. The refinery had just resumed normal operations following a loss of steam on April 16, the company said on April 17. MIDWEST Holly El Dorado, 135.0 Power outage on April 28 shut Frontier KS an unspecified operating unit. Workers were attempting to re- start the unit a filing to regulators said. Marathon Detroit, 120.0 Fire on April 27 at a sour-water Pete. MI tank didn’t impact operations, the co. said on April 28. ROCKIES WEST COAST Chevron Richmond, 245.0 Crude oil being introduced Corp. CA to crude unit, the co. said on April 26. A leak at asso- ciated piping on Aug. 6 caused a major fire shutting the crude unit and reducing other operations at the plant. The timing of the refinery’s return to normal operations wasn’t specified. PLANNED CANADA Husky Saskatchewan Major turnaround to take place Spring Energy in spring of 2013. Plant-wide 2013 shutdown is planned for in- spection and equipment repairs. Valero Quebec 100.0 Plant-wide shutdown for turn- June Energy around work will begin in April 2013 and continue for nine weeks. CARIBBEAN Valero Aruba Refinery will be converted to a terminal while the company con- tinues to seek a buyer. EAST COAST PBF Delaware 182.2 Work will be done on fluid coker 4Q Energy City during the 4Q 2013. 2013 Paulsboro, 160.0 Crude unit maintenance in 4Q 4Q N.J. 2013. 2013 GULF COAST Chal- Chalmette, 200.0 Planned maintenance at unspeci- April 27 mette LA. fied process units concluded over April 27/28 weekend, the co. said. Traders in the region said FCCU and alkylation unit were the focus of the work. Valero Meraux, LA 135.0 Refinery expected to resume nor- May 8 Energy mal operating rate in about a week following maintenance at un- specified units and catalyst changeouts, the co. said on May 1. Valero Sunray, 170.0 Five weeks of work on the crude May McKee Texas unit to begin in April, the 2013 company said Jan. 29. Work was originally set to begin in March for four weeks. MIDWEST BP Whiting, IN 336.0 Largest of three CDUs shut for Mid-2013 replacement, the company said on Oct. 31 as part of major expansion project. Completion on track for second-half 2013. Exxon Joliet, IL 250.0 Planned maintenance under way, Mobil the company said on April 17. All operating units are involved in this round of work. No restart estimate provided. Holly El Dorado 135.0 Planned maintenance continues Frontier KS an April 16 NRC filing said. The work at unspecified process units has been under way since March 29. No restart estimate. Husky Lima, Ohio 160.0 45 days of major turnaround scheduled in 2014; 70% of units involved. Remaining 30% will undergo major turnaround in 2015, the company said Feb. 9. Northern St.Paul Park, 84.5 Refinery will shut in April for April Tier Minn. 25 days to complete expansion project, the company said March 14. FCCU maintenance is planned in October October for most of the month. ROCKIES WEST COAST Alon Bakersfield 94.0 Company purchasing asphalt to Calif. Long Beach supply 2013 asphalt season. Re- Complex Paramount fining complex operations still CA suspended. Seeking permit to build rail line to supply midcontinent crude, the company said on March 8. Chevron Richmond, 230.0 Crude introduced to CDU shut by 2nd Q Corp. CA Aug. 6 fire. Company expects nor- 2013 mal operations by the 2nd quarter. Exxon Torrance, 155.0 Several unspecified process units CA will be down for planned work for several weeks, the company said May 2. Shell Martinez, 165.0 Several unspecified process April 25 CA units restarted on April 25 following maintenance – filing. Tesoro Anacortes, 120.0 Company said May 2 that the refinery Corp. WA is resuming normal operations after planned work on FCCU. Tesoro Kapolei, 94.0 Refinery will stop production Hawaii and convert to a storage, import and distribution terminal by April. [/pre] (END) Dow Jones Newswires 05-03-131333ET