Refining Community Logo

Update Nov 2010 NA Refinery T/A Plan & Unplan Maint

Home Forums Coking Maintenance Shutdown/Turnaround Update Nov 2010 NA Refinery T/A Plan & Unplan Maint

This topic contains 0 replies, has 1 voice, and was last updated by  basil parmesan 10 years ago.

  • Author
    Posts
  • #2469

    basil parmesan
    Participant

    Refinery Status:Shell’s Martinez Plant Had A -2-

    Published November 09, 2010  | Dow Jones Newswires

    The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn’t purport to be a comprehensive list.
    A mechanical problem caused unplanned flaring at Royal Dutch Shell’s 156,000 barrel-a-day refinery in Martinez, California, early Sunday morning, according to a filing with state regulators.
    Tesoro said Friday that its Anacortes, Wash., refinery, rocked by a deadly explosion in April, will return to normal operating rates by the end of the following week.
    For more detailed information, search Dow Jones Newswires using the code N/REF.
    Operator     Refinery Capacity      Description       Restart (in 000s bbl/day)
    UNPLANNED
    CANADA
    EAST COAST
    Conoco Linden, NJ 238.0 Bayway was preparing to restart units, including the FCCU, after a complete power outage early Oct. 25, a person familiar with the plant said Oct. 27. Power was restored at about 3 p.m. Oct. 26.
    CARIBBEAN
    GULF COAST
    BP Texas City, TX 456.0 Resid Hydrotreater Unit restarted Oct 29 Oct 22 following maintenance.
    Exxon Baytown, TX 557.0 FCCU No. 2 capacity reduced during a brief loss of oxygen from a 3rd source Nov. 2, a regulatory filing said.
    Motiva Port Arthur, TX 285.0 Turnaround continues at 90,000-B/D FCCU. Early Unit shut unplanned Nov in late Aug. Soon thereafter the Co. decided to advance turnaround maintenance; seen concluding in early Nov. said source on Oct 18. Tail gas treatment unit shut Oct 18 for brief precautionary maintenance on Oct 18. An unidentified unit shut after a flash fire Sep 12 at a process heater, Shell said on Sept 13.
    Valero Corpus Christi, TX 315.0 Butamer unit shut for brief repair on Oct. 19. No impact to production, the Co. said.
     Valero Port Arthur, TX 325.0 Repairing leak found in a cooler at Cat reformer no. 1344 Oct. 26. Co. said this will have no impact to production.
    Valero Three Rivers, TX 100.0 Brief emissions reported Nov. 1 after a pressure valve tog stuck on equipment at a hydrodesulfirization unit. No impact to production.
    MIDWEST
    BP/Husky Toledo, OH 160.0 Crude oil throughput was reduced n/a by unspecified amount owing to Enbridge’s crude oil Line 6B leak/closure since July 26.
    Exxon Joliet, IL 239.0 Refinery operations may be affected by Enbridge’s decision to reduce crude oil delivery rates on Line 6A while integrity inspections continue. Co. not immediately available for comment on Oct. 13.
    Marathon Robinson, IL 206.0 Trade sources say crude unit shut around Oct 16-17 for 25 maintenance. Restart seen by Oct. 22 or 25. Co. wouldn’t comment.
    Conoco Wood River, IL 362.0 Ops being restored at units after a partial power outage, Co. said Oct. 29.
    ROCKIES
    WEST COAST
     Shell Martinez 156.4 Mechanical problem caused CA unplanned flaring activity, a state regulatory filing said Nov. 7.
    Conoco Rodeo, CA 120.2 Flaring activity from unknown cause Oct 22. Tesoro Anacortes 120.0 Refinery seen at normal operations by Nov. 13, Co. said Nov. 5. Plant was shut after deadly April 2 explosion.
    Valero Wilmington, CA 135.0 Flaring reported due to compressor failure on Oct. 19. The event did not affect production, the Co. said.
    PLANNED
    CANADA
    Shell Montreal 130.0 The refinery will be converted into Quebec terminal.
    CARIBBEAN
     Valero Aruba 235.0 Turnaround maintenance that late began in June is seen concluding late Dec or early Jan. early The decision on whether Jan units will be restarted after 2011 the turnaround ends will be made at that time.
    EAST COAST
    Sunoco Westville, NJ 145.0 Idling all Eagle Point refining operations indefinitely due to poor economics, co. said Oct. 6, 2009.
    Valero Delaware 210.0 PBF Energy has closed Apr 2011 deal to buy plant. Petroplus said May 5 the plant would be restarted in 2Q of 2011.
    Valero Paulsboro, NJ 185.0 Agreed to sell refinery for $360 million to PBF Energy, Co. said Sept. 27. Deal is expected to close in Q4.
    Western Yorktown, VA 64.5 The refinery will close in September 2010 for economic reasons. Terminal operations will continue. Maintenance had been planned for 3Q 2010.
    GULF COAST
    BP Texas City, TX 455.8 Work on FCCU No. 1’s electrostatic precipitator stack began Sept. 28. Up to 3 of the 10 cells will be removed.
    Conoco Borger, TX 146.0 Maintenance on Unit 50 Coker on Sept. 16-18, Co. said
    Chevron Pascagoula, Miss. 330.0 Pre-commercial heavy oil 2010 conversion project delayed from 2008 to 2010 due to economic factors. Expansion project including the replacement of two 30-year- old reformers and construction of a 55,000 b/d continuous catalytic reformer platformer unit to be completed by late summer, Industrial Info Resources said July 6. A premium base-oil facility was also being planned, co. said in late Feb.
    Exxon Baytown, TX 560.6 New ULSD Units commissioned, Co. said Oct 21. ULSD supply will increase by over 3 million gallons from Baytown & Baton Rouge. Extended period of scheduled Est. maintenance at crude unit, End Oct several hydrofiners and other units starts week of Aug 22. Return to normal operations unclear, sources say work will take two months to complete.
    Exxon Chalmette, LA 120.0 Crude throughput will be reduced to 90,000-b/d as redundant units and about 70 jobs are taken out of service and cut for economic reason. These have begun to take place, the co. said Aug 26.
    Flint Corpus Christi, TX 290.0 FCCU No. 2, Sulfur Recovery Sep 24 Hills Christi, TX No. 1 to shut for maintenance on Sept. 10. Hydrocracker shut for planned work Oct. 4 with emissions expected to end Oct. 6. $250 mln project for new Spring 2010 diesel desulfurization, sulfur recovery unit to begin in Fall 2008. Construction to last 18 months.
    Motiva Port Arthur, TX 285.0 Expansion project to increase 1Q throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen 1Q 2012, from 2010.
    Valero Corpus Christi, TX 340.0 West Plant 50,000-b/d FCCU at reduced rates since mid-Dec for economic reasons. Crude unit compressor at Complex 7 of the East Plant shut for planned work Oct. 27. No impact to production; Co. said.
    Valero Norco, LA 250.0 Hydrocracker project will proceed and be completed in late 2013, the co. said on July 27. FCCU, 100,000 b/d, will be 2Q revamped and work will take 2011 place at a alky unit, lasting 55 days starting in March, Co. said Oct. 26. Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012.
    Valero Port Arthur, TX  325.0 Hydrocracker project will proceed and be completed in late 2012, the co. said on July 27. Six coke drums will be replaced in 2011. 77,000-b/d FCCU at reduced n/a rates since mid-Dec for economic reasons.
    Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a rates since mid-Dec for economic reasons. Expanded crude gather system 4Q will increase available crude 2010 supplies to refinery by 4Q. 24-day turnaround to begin on 2Q 30,000-b/d hydrocracker in 2011. March 2011.
    MIDWEST
    BP Toledo, OH 155.0 $400 million upgrade 2012 to start 2010.
    Husky Lima, OH 160.0 Scheduled fall turnaround maintenance began Oct 15 for 40 days, the co. said on Oct 18.
    Marathon Detroit, MI 106.0 Turnaround maintenance got underway Oct 10 week. Scope of work and restart unclear.
    Valero Ardmore, OK 90.0 Plant-wide turnaround planned; 2Q work will impact 1Q 2011 2011 results. It will begin in March and last 40 days, Co. said Oct. 26
    ROCKY MOUNTAIN
    Suncor Commerce City, CO 93.0 Planned work at reformer unit deferred to Fall 2010 from Feb 2010 28 start date.
    WEST COAST
    BP Carson, CA 265.0 Planned flaring to begin Oct. Nov 8 22 through Nov. 8. This event follows planned flaring between Oct. 13 and 20 and from Sept. 27-30. The reason for the flaring is unknown; it is not associated with equipment breakdown. Planned flaring Oct. 30-Nov 5 is related to reformer unit maintenance, a person familiar with operations said Oct. 29.
    Shell Martinez, CA 156.4 Performing repairs on flare system, Co. reported Oct. 4.
    Conoco Wilmington 139.0 Planned flaring expected Oct. Oct. 31 CA 1-31. The event is not due to equipment breakdown. Co. previously reported planned flaring for Sept. 10-30. FCCU and alkylation units to Oct. 15 resume normal operations by Oct. 15 after completing work, a person familiar with operations said Oct. 1.
    Valero Benicia 170.0 Scrubber installation continues; 2010 CA work seen concluding by year-end, the co. said on July 27. Plantwide turnaround to begin in 1Q January 2011 and will last 36 days.
    Tesoro Golden Eagle Martinez. CA 166.0 Major turnaround maintenance deferred to 2011 from late 2009, the co. said Feb. 3. FCCU, 70k b/d, restarted, trade Oct. 14 sources said Oct 14. The unit was shut on Sept 30.
    Tesoro Wilmington 97.0 Flaring extended to Oct 16. CA Flaring too place Oct 14-15; the event is not due to equipment breakdown.

You must be logged in to reply to this topic.