North American Planned, Unplanned Refinery Shutdowns (Table)
By Robert Tuttle
January 9, 2009 (Bloomberg) — Following is a table of scheduled and unplanned
refinery shutdowns, maintenance, new plants and capacity expansions in North
America. The list only includes work that could be confirmed.
Shutdown Type: P: Planned, U: Unplanned, N: Non-maintenanceRefinery Refinery
Owner Shutdown Capacity
Location Type Period b/d Notes
——————————————————————————–
New Information:
Chevron El Segundo P Jan 05, 09 260,000 FCC shuts for major
Chevron Corp to repairs.
California, U.S. Feb 15, 09Big West Oil P Dec 30, 08 68,000 Full shutdown for
Bakersfield to hydrocracker maintenance,
Flying J Oil & Gas Jan, 09 10-day catalyst change.
Inc
California, U.S.Current Outages:
BP Texas City U Jan 06, 09 470,000 Reformer shut because of
BP PLC to tube leak.
Texas, U.S. Jan 13, 09Chevron El Segundo P Jan 05, 09 260,000 FCC shuts for major
Chevron Corp to repairs.
California, U.S. Feb 15, 09Shell Deer Park P Jan 05, 09 340,000 CDU, FCC, Hydrocracker,
Royal Dutch Shell to coker, platformer,
PLC, Petroleos Jan 26, 09 hydrodesulfurization,
Mexicanos Sulfur Recovery Units No.
Texas, U.S. 6 and No. 7 and hydrogen
plant maintenance for
three weeks, will reduce
crude runs.Valero Benicia P Qtr 1, 09 153,000 Full shutdown scheduled
Valero Energy Corp to for 2009 in five-year
California, U.S. Qtr 4, 09 cycle of maintenance.Valero Krotz Springs P Qtr 1, 09 83,100 Full turnaround planned
Alon USA Energy Inc to for 2009.
Louisiana, U.S. Qtr 4, 09Sunoco Philadelphia P Qtr 1, 09 330,000 New Hydrocracker
Sunoco Inc to conversion project to
Pennsylvania, U.S. Qtr 4, 09 start operations in 2009,
upgrading 45,000 b/d of
product into ultra-low
sulfur diesel.Conoco Borger P Qtr 1, 09 146,000 New capacity,
ConocoPhillips, to debottlenecking to add
EnCana Corp Qtr 4, 09 20,000 b/d bitumen
Texas, U.S. capacity.Navajo Artesia P Jan, 09 75,000 New hydrocracker,
Holly Corp to capacity 15,000 barrels a
New Mexico, U.S. Jan, 09 day, expected to start
production. Turnaround
planned.Sunoco Philadelphia P Jan 02, 09 330,000 Hydrotreater shut for
Sunoco Inc to maintenance.
Pennsylvania, U.S. Jan, 09Exxon Mobil Torrance P Dec 30, 08 155,000 FCC, alkylation,
Exxon Mobil Corp to hydrotreater units shut
California, U.S. Jan 30, 09 for maintenance.Big West Oil P Dec 30, 08 68,000 Full shutdown for
Bakersfield to hydrocracker maintenance,
Flying J Oil & Gas Jan, 09 10-day catalyst change.
Inc
California, U.S.Petro Star Valdez U Dec 28, 08 50,000 Full shutdown after fire
Artic Slope Regional to at refinery, which
Corp N/A produces jet fuel, marine
Alaska, U.S. diesel and heating oil.Cenex Laurel U Dec 25, 08 55,000 Diesel hydrotreater shut
CHS Inc to by fire. Restart possible
Montana, U.S. Jan, 09 in January 2009.Total Port Arthur P Dec 18, 08 240,000 Gas condensate splitter
Total SA to shuts for a month.
Texas, U.S. Jan 19, 09Paramount P Dec 15, 08 55,000 Full shutdown and
Alon USA Energy Inc to hydrocracker startup to
California, U.S. Feb, 09 increase gasoline, diesel
output by 50 percent.Delek LaGloria U Nov 20, 08 58,000 Full shutdown after
Delek US Holdings Inc to explosion in saturated
Texas, U.S. May, 09 gas unit for naphtha
hydrotreater. Restart
planned for May 2009.Future Outages:
Tesoro Anacortes P Jan 15, 09 115,000 Full shutdown for 30 days
Tesoro Corp to starting in mid-January.
Washington, U.S. Feb, 09Big West Oil P Feb 01, 09 68,000 Runs cut by turnaround.
Bakersfield to Additional details not
Flying J Oil & Gas Feb, 09 available.
Inc
California, U.S.Valero Texas City P Feb, 09 230,000 CDU, VDU shut for 35
Valero Energy Corp to days, coker shuts for 40
Texas, U.S. Feb, 09 days. Maintenance delayed
from 2008 because of
Hurricane Ike.PEMEX Cardenas P Feb 02, 09 190,000 New units to expand
Minatitlan to capacity to 260,000 b/d
Petroleos Mexicanos Feb 28, 09 scheduled to start in
Mexico February 2009.North Atlantic N P Qtr 2, 09 105,000 CDU, hydrocracker shut
Atlantic to for maintenance in 2Q
Harvest Energy Trust Qtr 2, 09 2009.
Newfoundland and
Labrador, CanadaValero Norco St P Qtr 3, 09 250,000 New CDU expansion to add
Charles to 45,000 b/d crude
Valero Energy Corp Qtr 3, 09 capacity, 10,000 b/d
Louisiana, U.S. coking to start in third
quarter 2009.Western Refining P Qtr 3, 09 61,900 Turnaround scheduled for
Yorktown to third quarter 2009, no
Western Refining Inc Qtr 3, 09 more specific details
Virginia, U.S. available.Marathon Canton P Qtr 3, 09 73,000 New distillate
Marathon Oil Corp, to hydrotreater, capacity
Ashland Inc Qtr 4, 09 19,000 b/d, to be
Ohio, U.S. completed in late 2009 to
produce 15 ppm diesel.BP Texas City P Sep 08, 09 470,000 FCCU No. 3 shuts for
BP PLC to turnaround.
Texas, U.S. Oct 01, 09Marathon Garyville P Qtr 4, 09 275,000 New CDU, VDU,
Marathon Oil Corp, to hydrocracker (capacity
Ashland Inc Qtr 4, 09 70,000 b/d), delayed
Louisiana, U.S. coker (44,000 b/d),
reformer (65,000 b/d),
kerosene hydrotreater
(47,000) planned to come
on line, raising refinery
throughput to 425,000
barrels a day.Conoco Wood River P Qtr 1, 10 306,000 New Coker, 65,000 b/d
EnCana Corp, to capacity, scheduled to
ConocoPhillips Qtr 4, 10 come on stream in 2010.
Illinois, U.S. Refinery capacity to
increase to 360,000 b/d.Flint Hills Corpus P Qtr 1, 10 300,000 New diesel dsulfurization
Christi to unit and sulfur recovery
Koch Industries Inc Qtr 1, 10 plant planned to be
Texas, U.S. completed early 2010.Valero Benicia P Qtr 1, 10 153,000 New units to expand CDU
Valero Energy Corp to capacity 25% to daily
California, U.S. Qtr 4, 10 runs of 180,000 b/d,
coker by 25%, SRU by 50%
to handle heavier crudes,
reduce gasoil imports and
expand gasoline output.Farmland Coffeyville P Qtr 1, 10 115,000 Full turnaround scheduled
CVR Energy Inc to for 2010, in cycle of
Kansas, U.S. Qtr 4, 10 every three to four
years. Last event was
Feb-April 2007.Pasadena P Qtr 1, 10 106,500 New units to double
Nationale A to capacity to 200,000
Portefeuille Qtr 4, 10 barrels a day planned to
Texas, U.S. start in 2010.Chevron Richmond P Qtr 1, 10 257,200 New Hydrogen plant,
Chevron Corp to reforming units to
California, U.S. Qtr 4, 10 improve crude feedstock
flexibility scheduled to
start in 2010. No change
to refinery capacity.Placid Port Allen P Qtr 1, 10 57,000 New FCC, units to expand
Placid Refining Co to capacity to 80,000
LLC Qtr 4, 10 barrels a day scheduled
Louisiana, U.S. to be completed in 2010.Motiva Port Arthur P Qtr 1, 10 285,000 New units to add 325,000
Motiva Enterprises to b/d crude capacity, to
LLC Qtr 4, 10 start in 2010.
Texas, U.S.Chevron Pascagoula P Qtr 2, 10 330,000 New Platformer/CCR unit
Chevron Corp to to start output in
Mississippi, U.S. Qtr 3, 10 mid-2010, to increase
gasoline output 10%, or
600,000 gallons a day.Exxon Mobil Baytown P Qtr 3, 10 563,000 New Desulfurization unit
Exxon Mobil Corp to to raise diesel output to
Texas, U.S. Qtr 4, 10 start output by end 2010.Exxon Mobil Baton P Qtr 3, 10 488,600 New Desulfurization unit
Rouge to to raise diesel output to
Exxon Mobil Corp Qtr 4, 10 start output by end 2010.
Louisiana, U.S.Marathon Detroit P Qtr 4, 10 100,000 New Coker, capacity
Marathon Oil Corp, to 28,000 b/d, scheduled to
Ashland Inc Qtr 4, 10 enter service, along with
Michigan, U.S. sulfur recovery unit (280
long tons/day),
distillate hydrotreater
(33,000 b/d) and hydrogen
plant. Nameplate capacity
of refinery to increase
to 115,000 b/d.Valero Norco St P Qtr 4, 10 250,000 New Hydrocracker planned
Charles to to enter service in
Valero Energy Corp Qtr 4, 10 fourth quarter 2010.
Louisiana, U.S.Sinclair Tulsa P Qtr 4, 10 60,000 New CDU, hydrocracker,
Sinclair Oil Corp to coker units planned to
Oklahoma, U.S. Qtr 4, 10 start operations.
Capacity to increase to
115,000 barrels a day.Valero Memphis P Qtr 1, 11 190,000 FCC revamp planned for
Valero Energy Corp to 2011, delayed from 2009.
Tennessee, U.S. Qtr 4, 11Valero Port Arthur P Qtr 1, 11 325,000 New Hydrocracker
Valero Energy Corp to construction to be
Texas, U.S. Qtr 4, 11 completed, capacity
50,000 barrels a day, to
start in 2011. Had been
scheduled for 4th quarter
2010.Total Port Arthur P Qtr 1, 11 240,000 New Coker (50,000 b/d),
Total SA to desulfurization and
Texas, U.S. Qtr 4, 11 vacuum distillation unit.
The $2.2 billion project
is scheduled to be
completed in 2011.Valero Port Arthur P Qtr 2, 11 325,000 New Coker construction to
Valero Energy Corp to be completed, capacity
Texas, U.S. Qtr 2, 11 45,000 barrels a day,
during 2Q of 2011.
Refinery throughput to
rise to 415,000 b/d in
conjunction with related
investments. PROJECT
SHELVED IN OCT 2008.BP Whiting P Qtr 4, 11 420,000 New Coker, capacity
BP PLC to 120,000 b/d, along with
Indiana, U.S. Qtr 4, 11 related units to process
Canadian heavy oil
scheduled to begin
service in late 2011.Consumers’ Co-op P Jan, 12 100,000 New CDU expansion to add
Regina to 30,000 b/d capacity to a
Federated Dec, 12 total 130,000 b/d, also
Co-operative Ltd add FCC complex, planned
Saskatchewan, Canada to start operations in
2012.Valero Quebec City P Qtr 1, 12 215,000 New Hydrocracker,
Valero Energy Corp to de-asphalting units
Quebec, Canada Qtr 4, 12 planned for 2012 startup.Conoco Borger P Qtr 1, 12 146,000 New units to expand crude
ConocoPhillips, to distillation to 200,000
EnCana Corp Qtr 4, 12 b/d, with 75,000 b/d
Texas, U.S. bitumen capacity.Historical Outages:
Conoco Billings U Dec 25, 08 58,000 Gasoline production cut
ConocoPhillips to by fire. Repairs
Montana, U.S. Jan 08, 09 estimated to take two
weeks.Citgo Corpus Christi U Dec 21, 08 156,000 Runs cut after fire in
Petroleos de to sulfur recovery unit.
Venezuela SA Dec, 08
Texas, U.S.Valero Corpus Christi N Dec 18, 08 110,000 Full shutdown because of
East to power failure.
Valero Energy Corp Dec 21, 08
Texas, U.S.Holly Woods Cross P Dec 15, 08 26,000 Hydrocracker, capacity
Holly Corp to 15,000 barrels a day,
Utah, U.S. Dec, 08 starts production. Crude
refining capacity rises
to 31,000 barrels a day.BP Texas City U Dec 15, 08 470,000 Hydrpocracker shut for
BP PLC to repairs. Restart
Texas, U.S. Dec 18, 08 confirmed.BP Texas City P Dec 15, 08 470,000 Hydrocracker shuts for
BP PLC to maintenance.
Texas, U.S. Dec 17, 08BP Carson N Dec 14, 08 265,500 FCC shuts because of a
BP PLC to malfunction. Restart
California, U.S. Jan 06, 09 began Jan. 5.Valero Norco St U Dec 14, 08 250,000 FCC shuts for unplanned
Charles to repairs. Restart
Valero Energy Corp Jan 06, 09 confirmed.
Louisiana, U.S.Citgo Corpus Christi U Dec 10, 08 156,000 Platformer repairs to fix
Petroleos de to steam leaks.
Venezuela SA Dec, 08
Texas, U.S.Valero Corpus Christi N Dec 10, 08 110,000 CDU, hydrocracker shut by
East to power cut.
Valero Energy Corp Dec 12, 08
Texas, U.S.Valero Corpus Christi U Dec 02, 08 110,000 Hydrocracker, capacity
East to 36,000 b/d, shut for
Valero Energy Corp Dec 09, 08 repairs.
Texas, U.S.Valero Paulsboro P Dec 01, 08 195,000 FCC shut for repairs.
Valero Energy Corp to Outage extended because
New Jersey, U.S. Dec 31, 08 of low margins. Restart
confirmed.Exxon Mobil Torrance U Dec 01, 08 155,000 Runs cut by unspecified
Exxon Mobil Corp to outage.
California, U.S. Dec, 08Tesoro Wilmington N Nov 25, 08 100,000 Catalytic reformers shut.
Tesoro Corp to
California, U.S. Dec, 08BP Texas City U Nov 23, 08 470,000 Hydrocracker shuts for
BP PLC to repairs.
Texas, U.S. Nov 25, 08Tesoro Wilmington U Nov 21, 08 100,000 Runs cut after fault on
Tesoro Corp to crude unit. Restart
California, U.S. Nov 24, 08 confirmed.Western Refining El P Nov 13, 08 122,000 CDU, reformer, diesel
Paso to hydrotreater maintenace
Western Refining Inc Dec 11, 08 starts Nov. 13, brought
Texas, U.S. forward from January.
Shutdown is 28 days.Valero Houston U Nov 11, 08 90,000 FCC shuts after
Valero Energy Corp to compressor malfunction.
Texas, U.S. Nov 15, 08 Restart confirmed.Conoco Borger U Nov 11, 08 146,000 Runs cut by unplanned CDU
ConocoPhillips, to repairs.
EnCana Corp Nov 14, 08
Texas, U.S.Petrojam N Nov 09, 08 36,000 Runs cut to 25,000 b/d
Petroleum Corp of to after a CDU leak.
Jamaica Nov, 08
JamaicaValero Port Arthur U Nov 07, 08 325,000 Hydrocracker shuts for
Valero Energy Corp to leak.
Texas, U.S. Nov 11, 08Irving Saint John P Nov 06, 08 300,000 CDU No. 3, diesel
Irving Oil Corp to hydrotreater, sulfur
Newfoundland and Dec 03, 08 plant shut for
Labrador, Canada maintenance. Restart
confirmed.Valero Delaware City P Nov 04, 08 190,200 CDU, capacity 180,000
Valero Energy Corp to b/d, shuts for 25 day
Delaware, U.S. Dec 12, 08 maintenance in November,
FCC shuts for 15 days.
This was delayed from
October.Conoco Borger P Nov 04, 08 146,000 FCC maintenance on
ConocoPhillips, to electrostatic
EnCana Corp Nov 18, 08 precipitators.
Texas, U.S.Marathon Texas City U Nov 03, 08 72,000 CDU, capacity 52,000 b/d,
Marathon Oil Corp, to shuts after fire. Restart
Ashland Inc Nov 18, 08 confirmed.
Texas, U.S.Imperial Oil Sarnia P Oct 30, 08 121,000 Runs cut by partial
Exxon Mobil Corp to turnaround at main units.
Ontario, Canada Nov 30, 08 More specific details not
disclosed.Valero Paulsboro U Oct 30, 08 195,000 FCC shuts because of
Valero Energy Corp to upset. Restart confirmed.
New Jersey, U.S. Nov 06, 08Flint Hills Corpus P Oct 27, 08 300,000 FCC No. 2, SRU shut for
Christi to maintenance. Restart
Koch Industries Inc Dec 03, 08 confirmed.
Texas, U.S.Shell Canada Scotford P Oct 24, 08 100,000 Partial outage, unit shut
Royal Dutch Shell PLC to not identified.
Alberta, Canada Nov, 08Pasadena P Oct 24, 08 106,500 FCC shuts for
Nationale A to maintenance.
Portefeuille Oct, 08
Texas, U.S.Marathon Texas City U Oct 23, 08 72,000 Partial outage,
Marathon Oil Corp, to unidentified unit shuts.
Ashland Inc Oct, 08
Texas, U.S.Valero Wilmington P Oct 22, 08 135,000 FCC shuts for repairs.
Valero Energy Corp to Restart confirmed.
California, U.S. Nov 03, 08PEMEX Hidalgo Tula P Oct 21, 08 273,000 CDU, VDU shut for
Petroleos Mexicanos to maintenance.
Mexico Nov 19, 08Husky Lima P Oct 18, 08 160,000 Hydrocracker shuts for
Husky Energy Inc to repair for three weeks.
Ohio, U.S. Nov 09, 08 Restart confirmed.Hovensa St. Croix N Oct 15, 08 495,000 Full shutdown for
Petroleos de to Hurricane Omar. Restart
Venezuela SA, Hess Oct 20, 08 began Oct. 16 and will
Corp take `several days’
US Virgin Islands, according to the company.
U.S.Valero McKee U Oct 14, 08 164,000 FCC rates cut to minimum
Valero Energy Corp to level on poewr cable
Texas, U.S. Oct, 08 failure.Consumers’ Co-op N Oct, 08 100,000 Runs cut for unpsecified
Regina to reason. Additional
Federated Oct, 08 details not disclosed.
Co-operative Ltd
Saskatchewan, CanadaConoco Borger P Oct 06, 08 146,000 FCC repairs to
ConocoPhillips, to electrostatic
EnCana Corp Oct 16, 08 precipitators.
Texas, U.S.Valero Three Rivers P Oct 03, 08 95,000 Hydrocracker shuts for 28
Valero Energy Corp to days in October. Restart
Texas, U.S. Nov 17, 08 confirmed.Motiva Norco P Oct 03, 08 220,000 This planned turnaround
Saudi Arabian Oil Co, to delayed to replenish fuel
Royal Dutch Shell PLC Nov 10, 08 inventory after Hurricane
Louisiana, U.S. Ike. FCC, capacity
110,000 barrel-a-day, was
to shut for maintenance.Husky Lima N Oct 03, 08 160,000 Runs cut 25,000 b/d after
Husky Energy Inc to pipeline leak halted
Ohio, U.S. Oct 07, 08 crude supply. Refinery
ramped up on Oct. 6 after
pipeline repaired.Petro-Canada Montreal P Qtr 4, 08 105,210 New coker, planned to be
Petro-Canada to built by 2009, postponed
Quebec, Canada Qtr 4, 08 indefinitely.Farmland Coffeyville P Qtr 4, 08 115,000 Turnaround for
CVR Energy Inc to maintenance on nitrogen
Kansas, U.S. Qtr 4, 08 fertilizer. Event happens
every two years.Valero Ardmore P Oct, 08 85,000 FCC shuts for 20 days and
Valero Energy Corp to hydrocracker for 30 days
Oklahoma, U.S. Nov 26, 08 during October and
November. Restart
confirmed.BP Whiting P Oct, 08 420,000 Coker shuts for
BP PLC to maintenance. Restart
Indiana, U.S. Nov 15, 08 confirmed.Hovensa St. Croix N Oct, 08 495,000 FCC runs cut on weak
Petroleos de to margins. Duration of
Venezuela SA, Hess Oct, 08 cuts, confirmed Oct. 29,
Corp not disclosed.
US Virgin Islands,
U.S.Chevron Salt Lake P Oct, 08 45,000 Coker shuts for
City to maintenance. Restart
Chevron Corp Oct, 08 confirmed.
Utah, U.S.Imperial Oil P Oct 01, 08 184,000 Diesel unit shuts for
Strathcona to maintenance. Restart
Exxon Mobil Corp Nov 03, 08 confirmed.
Alberta, CanadaValero Houston U Sep 30, 08 90,000 FCC shuts for unplanned
Valero Energy Corp to repairs after fault found
Texas, U.S. Oct 20, 08 during restart because of
Hurricane Ike.Exxon Mobil Torrance P Sep 29, 08 155,000 Coker, reformer, fuel
Exxon Mobil Corp to gas, pretreatment units
California, U.S. Nov 16, 08 shut for maintenance.
Repairs delayed,
restarted mid-November.Murphy Meraux P Sep 15, 08 125,000 Turnaround for
Murphy Oil Corp to unidentified unit as of
Louisiana, U.S. Oct, 08 mid-September.Valero Ardmore N Sep 15, 08 85,000 Runs cut on lack of crude
Valero Energy Corp to supply after Hurricane
Oklahoma, U.S. Sep, 08 Ike.Exxon Mobil Baytown P Sep 13, 08 563,000 Flexicoker shut for
Exxon Mobil Corp to repairs. Restart
Texas, U.S. Nov 24, 08 confirmed.Total Port Arthur N Sep 12, 08 240,000 Full shutdown for
Total SA to Hurricane Ike.
Texas, U.S. Oct, 08Calcasieu Lake N Sep 12, 08 29,400 Full shutdown for
Charles to Hurricane Ike. Restart
Calcasieu Refining Co Sep 17, 08 confirmed.
Louisiana, U.S.Chevron Burnaby N Sep 12, 08 55,000 FCC shut down for
Chevron Corp to maintenance after upset.
British Columbia, Sep 17, 08 Unit restarted.
CanadaExxon Mobil Beaumont N Sep 11, 08 365,000 Full shutdown for
Exxon Mobil Corp to Hurricane Ike. Limited
Texas, U.S. Oct, 08 operations resumed.Marathon Texas City N Sep 11, 08 72,000 Full shutdown for
Marathon Oil Corp, to Hurricane Ike. Restarted
Ashland Inc Oct, 08 first week of October.
Texas, U.S.Pasadena N Sep 11, 08 106,500 Full shutdown for
Nationale A to Hurricane Ike.
Portefeuille Sep, 08
Texas, U.S.BP Texas City N Sep 11, 08 470,000 Full shutdown for
BP PLC to Hurricane Ike.
Texas, U.S. Sep, 08Valero Port Arthur N Sep 11, 08 325,000 Full shutdown for
Valero Energy Corp to Hurricane Ike.
Texas, U.S. Sep, 08Motiva Port Arthur N Sep 11, 08 285,000 Full shutdown for
Motiva Enterprises to Hurricane Ike.
LLC Sep, 08
Texas, U.S.Exxon Mobil Baytown N Sep 11, 08 563,000 Full shutdown for
Exxon Mobil Corp to Hurricane Ike.
Texas, U.S. Sep 19, 08Shell Deer Park N Sep 11, 08 340,000 Full shutdown for
Royal Dutch Shell to Hurricane Ike. Restart
PLC, Petroleos Sep 17, 08 confirmed.
Mexicanos
Texas, U.S.Valero Texas City N Sep 11, 08 230,000 Full shutdown for
Valero Energy Corp to Hurricane Ike. Restart
Texas, U.S. Sep 17, 08 confirmed.Valero Houston N Sep 11, 08 90,000 Full shutdown for
Valero Energy Corp to Hurricane Ike.
Texas, U.S. Sep 17, 08LyondellBasell N Sep 10, 08 287,000 Full shutdown for
Houston to Hurricane Ike. Restart
Access Industries Sep 23, 08 confirmed.
Holdings LLC
Texas, U.S.Conoco Sweeny N Sep 10, 08 260,000 Full shutdown for
Petroleos de to Hurricane Ike. Restart
Venezuela SA, Sep 16, 08 confirmed.
ConocoPhillips
Texas, U.S.Conoco Bayway Linden U Sep 07, 08 238,000 Isomerization unit shut
ConocoPhillips to by fire. Extent of damage
New Jersey, U.S. Sep, 08 not reported.Calcasieu Lake N Sep 03, 08 29,400 Full shutdown for
Charles to Hurricane Gustav. Restart
Calcasieu Refining Co Sep 10, 08 confirmed.
Louisiana, U.S.PEMEX Hidalgo Tula P Sep, 08 273,000 FCC shuts for planned
Petroleos Mexicanos to maintenance of up to 90
Mexico Dec, 08 days.Conoco Wood River P Qtr 3, 08 306,000 Catalytic cracker
EnCana Corp, to maintenance to install
ConocoPhillips Qtr 4, 08 wet-gas scrubbers to
Illinois, U.S. reduce emissions.BP Toledo P Sep, 08 155,000 CDU, coker, alkylation
BP PLC to units shut for
Ohio, U.S. Nov 17, 08 maintenance. Restart
confirmed.Suncor Sarnia P Sep 02, 08 80,000 Hydrocracker, gasoline
Suncor Energy Inc to hydrotreater shut for
Ontario, Canada Oct 12, 08 maintenance.PEMEX Cardenas P Sep, 08 190,000 Gasoline, diesel units
Minatitlan to shut for planned
Petroleos Mexicanos Sep, 08 maintenance.
MexicoExxon Mobil Joliet P Sep 01, 08 240,000 FCC, alkylation units
Exxon Mobil Corp to shut for maintenance.
Illinois, U.S. Oct, 08 Restart confirmed Oct.
14.Chevron Pascagoula N Sep 01, 08 330,000 Runs cut in connection
Chevron Corp to with Hurricane Gustav.
Mississippi, U.S. Sep 05, 08Exxon Mobil Baton N Aug 31, 08 488,600 Full shutdown for
Rouge to Hurricane Gustav. Restart
Exxon Mobil Corp Sep 05, 08 confirmed.
Louisiana, U.S.ConocoPhillips N Aug 29, 08 247,000 Full shutdown for
Alliance to Hurricanes Gustav and
ConocoPhillips Sep 16, 08 Ike. Restart confirmed.
Louisiana, U.S.Chalmette LA N Aug 29, 08 184,000 Full shutdown for
Petroleos de to Hurricane Gustav.
Venezuela SA, Exxon Sep, 08
Mobil Corp
Louisiana, U.S.Valero Krotz Springs N Aug 29, 08 83,100 Full shutdown for
Alon USA Energy Inc to Hurricane Gustav. Restart
Louisiana, U.S. Sep 08, 08 confirmed.Total Port Arthur P Aug 29, 08 240,000 Full shutdown for
Total SA to Hurricane Gustav.
Texas, U.S. Sep 08, 08Valero Texas City N Aug 29, 08 230,000 Runs cut for Hurricane
Valero Energy Corp to Gustav. Normal operations
Texas, U.S. Sep 08, 08 resumed.Valero Norco St N Aug 29, 08 250,000 Full shutdown for
Charles to Hurricane Gustav.
Valero Energy Corp Sep 08, 08
Louisiana, U.S.Motiva Norco N Aug 29, 08 220,000 Full shutdown for
Saudi Arabian Oil Co, to Hurricane Gustav.
Royal Dutch Shell PLC Sep 08, 08
Louisiana, U.S.Valero Houston N Aug 29, 08 90,000 Runs cut because of
Valero Energy Corp to Hurricane Gustav. Normal
Texas, U.S. Sep 08, 08 operations resumed.Valero Port Arthur N Aug 29, 08 325,000 Runs cut for Hurricane
Valero Energy Corp to Gustav. Restart
Texas, U.S. Sep 08, 08 confirmed.Motiva Convent N Aug 29, 08 235,000 Full shutdown in
Motiva Enterprises to preparation for Hurricane
LLC Sep 07, 08 Gustav. Restart
Louisiana, U.S. confirmed.Exxon Mobil Baytown N Aug 29, 08 563,000 Runs cut for Hurricane
Exxon Mobil Corp to Gustav.
Texas, U.S. Sep 05, 08Exxon Mobil Beaumont N Aug 29, 08 365,000 Runs cut for Hurricane
Exxon Mobil Corp to Gustav.
Texas, U.S. Sep 05, 08Murphy Meraux N Aug 29, 08 125,000 Full shutdown for
Murphy Oil Corp to Hurricane Gustav. Restart
Louisiana, U.S. Sep 05, 08 confirmed.Marathon Garyville N Aug 29, 08 275,000 Full shutdown for
Marathon Oil Corp, to hurricane Gustav. Restart
Ashland Inc Sep 03, 08 confirmed.
Louisiana, U.S.Motiva Port Arthur N Aug 29, 08 285,000 Runs cut to minimum rates
Motiva Enterprises to for Hurricane Gustav.
LLC Sep 03, 08
Texas, U.S.Conoco Lake Charles N Aug 29, 08 252,000 Full shutdown for
ConocoPhillips to Hurricane Gustav. Restart
Louisiana, U.S. Sep 03, 08 confirmed.Citgo Corpus Christi N Aug 22, 08 156,000 FCC shuts due to power
Petroleos de to failure. Restart
Venezuela SA Aug 25, 08 confirmed.
Texas, U.S.Valero Delaware City U Aug 20, 08 190,200 FCC output cut by
Valero Energy Corp to repairs.
Delaware, U.S. Aug 25, 08North Pole U Aug, 08 220,000 Runs cut for unspecified
Koch Industries Inc to repairs, gasoline
Alaska, U.S. Aug, 08 production reduced.Frontier El Dorado P Aug, 08 112,000 Coker installation
Frontier Oil Corp to begins.
Kansas, U.S. Aug, 08PEMEX Cardenas P Aug 16, 08 190,000 Diesel sulfur recovery
Minatitlan to units shut for
Petroleos Mexicanos Oct 01, 08 maintenance.
MexicoConoco Bayway Linden U Aug 16, 08 238,000 Un-named unit shut,
ConocoPhillips to causing flaring.
New Jersey, U.S. Aug, 08Sunoco Toledo P Qtr 3, 08 150,000 CDU, FCC units to shut in
Sunoco Inc to third quarter
Ohio, U.S. Qtr 3, 08 maintenance.Shell Canada Sarnia U Aug 15, 08 71,820 Partial shutdown after
Royal Dutch Shell PLC to unit fails. Shell
Ontario, Canada Aug, 08 wouldn’t identify the
unit and said customer
needs are being met
during the outage.Conoco Wood River U Aug, 08 306,000 FCC shuts for
EnCana Corp, to maintenance.
ConocoPhillips Aug, 08
Illinois, U.S.Alon Big Spring P Aug 13, 08 70,000 Repairs to cat crack will
Alon Israel Oil Co to be complete Aug. 13 and
Ltd Aug 26, 08 oil will be put in Aug.
Texas, U.S. 26. Repairs to the alky
unit will be complete
Sept. 3 and oil will be
put in Sept. 9.Valero Corpus Christi U Aug 13, 08 110,000 CDU shuts for unplanned
East to maintenance. Restart
Valero Energy Corp Aug 21, 08 confirmed.
Texas, U.S.Conoco Borger P Aug 12, 08 146,000 Repairs to fccu’s
ConocoPhillips, to electrostatic
EnCana Corp Aug 21, 08 precipitator.
Texas, U.S.Holly Woods Cross P Aug 11, 08 26,000 Turnaround for 26 days
Holly Corp to starts in week of Aug. 11
Utah, U.S. Sep 05, 08 at Woods Cross, Utah
refinery.Chevron El Segundo P Aug 11, 08 260,000 Turnaround shuts
Chevron Corp to unidentified unit.
California, U.S. Aug, 08Citgo Corpus Christi U Aug 11, 08 156,000 CDU, vacuum unit shuts
Petroleos de to for repairs.
Venezuela SA Aug 16, 08
Texas, U.S.Exxon Mobil Baytown U Aug 11, 08 563,000 Hydrocracker shuts for
Exxon Mobil Corp to repair. Restart
Texas, U.S. Aug 12, 08 confirmed.Marathon Catlettsburg N Aug 10, 08 239,000 Runs cut after leak shuts
Marathon Oil Corp, to crude oil supply
Ashland Inc Aug 13, 08 pipeline. Restart
Kentucky, U.S. confirmed.Total Port Arthur P Aug 06, 08 240,000 Two package boilers shut
Total SA to
Texas, U.S. Aug 24, 08Tesoro Wilmington P Aug 06, 08 100,000 Alkylation unit shuts.
Tesoro Corp to Restart confirmed.
California, U.S. Aug 08, 08Citgo Corpus Christi U Aug 06, 08 156,000 Crude vacuum unit
Petroleos de to
Venezuela SA Aug 07, 08
Texas, U.S.Petro-Canada Edmonton P Aug 05, 08 135,000 Turnaround for 60 days
Petro-Canada to began Aug. 3. Restart
Alberta, Canada Nov 03, 08 confirmed Nov. 3. Full
rates planned for end
November.Petro-Canada Edmonton P Qtr 3, 08 135,000 Full shutdown of 135,000
Petro-Canada to bbl/day refinery during
Alberta, Canada Oct, 08 the second half 2008 to
allow new units to be
added to the plant as
part of an upgrade.Marathon Texas City N Aug 04, 08 72,000 Full shutdown because of
Marathon Oil Corp, to storm. Restart confirmed.
Ashland Inc Aug 06, 08
Texas, U.S.Valero Port Arthur N Aug 04, 08 325,000 Rates reduced because of
Valero Energy Corp to storm
Texas, U.S. Aug 05, 08Valero Texas City P Aug 04, 08 230,000 Rates reduced because of
Valero Energy Corp to storm
Texas, U.S. Aug 05, 08Valero Houston N Aug 04, 08 90,000 Rates reduced because of
Valero Energy Corp to storm.
Texas, U.S. Aug 05, 08Exxon Mobil Torrance P Aug, 08 155,000 Hydrodesulfurization unit
Exxon Mobil Corp to shuts for repairs.
California, U.S. Aug 31, 08Petro-Canada Edmonton U Aug 03, 08 135,000 FCC shuts because of
Petro-Canada to fault, leading to
Alberta, Canada Aug 27, 08 regional gasoline
shortages. Restart
confirmed.Holly Woods Cross P Aug, 08 26,000 Turnaround planned.
Holly Corp to
Utah, U.S. Sep, 08Placid Port Allen P Aug, 08 57,000 Turnaround scheduled for
Placid Refining Co to 30 days during
LLC Sep, 08 August-September.
Louisiana, U.S.Tesoro Wilmington N Jul 30, 08 100,000 Two process units shut
Tesoro Corp to after power failure.
California, U.S. Aug, 08BP Texas City P Jul 29, 08 470,000 FCC Electrostatic
BP PLC to Precipitator Stack trips
Texas, U.S. Aug, 08 and rates reduced.Irving Saint John N Jul 29, 08 300,000 Runs cut after power
Irving Oil Corp to loss.
Newfoundland and Aug, 08
Labrador, CanadaConocoPhillips U Jul 28, 08 247,000 FCC shut because of leak
Alliance to
ConocoPhillips Aug, 08
Louisiana, U.S.Valero Port Arthur P Jul 23, 08 325,000 Runs cut 10%-20% by
Valero Energy Corp to Hurricane Dolly.
Texas, U.S. Jul, 08Valero Houston N Jul 23, 08 90,000 Runs cut 10%-20% by
Valero Energy Corp to Hurricane Dolly.
Texas, U.S. Jul, 08BP Texas City U Jul 22, 08 470,000 FCC No. 1 runs cut
BP PLC to because of fault.
Texas, U.S. Jul, 08Valero Aruba U Jul 19, 08 275,000 Runs cut by 5,000 barrels
Valero Energy Corp to a day for minor
Aruba Jul, 08 maintenance. Operations
return to normal.Shell Deer Park N Jul 17, 08 340,000 FCC rates reduced after
Royal Dutch Shell to power disruption. Restart
PLC, Petroleos Jul 19, 08 confirmed.
Mexicanos
Texas, U.S.LyondellBasell P Jul, 08 287,000 CDU, coker shut for
Houston to maintenance. Crane
Access Industries Sep, 08 collapse during repairs
Holdings LLC kills 4 and delays work.
Texas, U.S. Rest of refinery operated
normally during the
event.BP Toledo P Jul 15, 08 155,000 Hydrocracker, reformer
BP PLC to shut for maintenance.
Ohio, U.S. Sep 04, 08Murphy Meraux P Jul, 08 125,000 Runs cut 10% on weak
Murphy Oil Corp to margins.
Louisiana, U.S. Aug, 08Murphy Superior P Jul, 08 35,000 Runs cut 25% on weak
Murphy Oil Corp to margins.
Wisconsin, U.S. Aug, 08PEMEX Hidalgo Tula N Jul 15, 08 273,000 Power cut shuts several
Petroleos Mexicanos to units. Restart confirmed.
Mexico Jul 17, 08Citgo Corpus Christi P Jul 15, 08 156,000 FCC shuts for
Petroleos de to maintenance. Unit
Venezuela SA Jul 17, 08 restarts July 16.
Texas, U.S.Conoco Borger P Jul 13, 08 146,000 Repairs scheduled on the
ConocoPhillips, to electrostatic
EnCana Corp Jul 22, 08 precipitators of unit 29,
Texas, U.S. a fluid catalytic
cracker.LyondellBasell P Jul 10, 08 287,000 Coker shutdown extended
Houston to through November. Restart
Access Industries Nov 26, 08 confirmed.
Holdings LLC
Texas, U.S.Total Port Arthur P Jul 09, 08 240,000 Hydrotreater and eight
Total SA to other units shut. Units
Texas, U.S. Jul 27, 08 restarting July 27 to
July 31.Petro-Canada Edmonton U Jul 09, 08 135,000 Full shutdown after
Petro-Canada to boiler failure. Restart
Alberta, Canada Jul 16, 08 confirmed.Valero Ardmore U Jul 08, 08 85,000 FCCU shut after power
Valero Energy Corp to disruption, restart
Oklahoma, U.S. Jul 11, 08 confirmed.Tesoro Martinez U Jul 08, 08 166,000 Gasoil hydrotreater shuts
Tesoro Corp to because of leaking valve.
California, U.S. Jul 09, 08 Restart confirmed.US Oil Tacoma N Jul 07, 08 35,000 Runs cut 50% after power
Nationale A to failure.
Portefeuille Jul, 08
Washington, U.S.Lion Oil El Dorado N Jul, 08 58,000 Asphalt production cut by
Ergon Inc to 50 percent after unit 9
Arkansas, U.S. Sep, 08 shut.BP Texas City U Jul 01, 08 470,000 Residual hydrotreater
BP PLC to restarts.
Texas, U.S. Jul 01, 08 -