Refining Community Logo

September 2008 Asia Refinery Maintenance Schedule Table Update

Home Forums Coking Maintenance Shutdown/Turnaround September 2008 Asia Refinery Maintenance Schedule Table Update

This topic contains 0 replies, has 1 voice, and was last updated by  Charles Randall 12 years, 2 months ago.

  • Author
    Posts
  • #3436

    Charles Randall
    Participant


    <Here is September 2008 update on Asia Refinery Maintenance Schedule. Seldom mention coking units on these tables – CR> 

    ———-
    Table Of Asia Refinery Maintenance Schedule
    SINGAPORE -September 9, 2008 (Dow Jones)- The following table lists maintenance schedules and outages for oil refineries in Asia.   More information will be added as it becomes available. Asia Refinery Maintenance Schedule For 2008
    Country Company Location Unit(B/D) Period/Duration

    China Sinopec Tianjin CDU Sep, 45 days
    (100,000)
    China PetroChina Lanzhou CDU End-Aug, 30 days
    (110,000)
    China PetroChina Lanzhou FCC End-Aug, 30 days
    (60,000)
    China Sinopec Jiujiang CDU Nov 11-early Feb 2008
    (50,000)
    India BPCL CDU Nov 15-Dec 14, 30 days
    (4.5 mln tons a year)
    India BPCL FCC Nov 15-Dec 14, 30 days
    (1.75 mln tons a year)
    India CPCL Chennai CDU Aug 3-4, 28 days
    (60,000)
    India IOC Panipat CDU Sep 18, 3 weeks
    (120,000)
    India IOC Koyali CDU Aug 25-28, 25 days
    (76,000)
    India IOC Mathura Diesel Hydrotreater Sep, 23 days
    (36,000)
    Indonesia Pertamina Balongan Whole refinery mid-Oct, 57 days
    (125,000)
    Indonesia Pertamina Cilacap CDU Aug 5, 21 days
    (118,000)
    Japan Cosmo Oil Sakai CDU Aug 22-Sep 30
    (80,000)
    Japan Cosmo Oil Chiba No.1 CDU Sep 13-Nov 9
    (110,000)
    Japan Cosmo Oil Yokkaichi No.5 CDU Sep 28-Nov 14
    (90,000)
    Japan Idemitsu Tokuyama CDU Early Oct-Late Nov
    (120,000)
    Japan Japan Energy Kashima CDU Aug. 26-30
    (210,000)
    Japan Japan Energy Kashima Condensate Splitter Sep 5-Oct 17
    (60,000)
    Japan Nippon Oil Mizushima No.3 CDU Sep 8-30
    (140,000)
    Japan Nippon Oil Negishi No.4 CDU Early Oct, 20 days
    (150,000)
    Japan Seibu Yamaguchi CDU Sep 1-Oct 6
    (120,000)
    Japan Taiyo Shikoku No.1 CDU Aug 29-Sep 2
    (88,000)
    S Korea GS Caltex Yeosu No. 2 CDU Early Aug, one month
    (130,000)
    S Korea Hyundai Daesan No.1 CDU May 17-Jun 12
    (110,000)
    S Korea SK Energy Ulsan No.5 CDU May 19, 40 days
    (260,000)
    S Korea SK Energy Ulsan No.1 CDU Jun 10, 10 days
    (60,000)
    S Korea SK Energy Ulsan No.4 CDU Jun 10, a few days
    (240,000)
    S Korea SK Energy Ulsan No. 1 RFCC Jun (30 days)
    (56,000)
    S Korea SK Energy Incheon No.2 CDU Jun 25-early Aug
    (200,000)
    S Korea SK Energy Incheon No.1 CDU Jun 26, 1 month
    (75,000)
    S Korea S-Oil Onsan No.2 VRDS Oct 1-26
    (42,000)
    Taiwan CPC Kaohsiung No.8 CDU Sep 12-Nov 5
    (100,000)
    Taiwan CPC Kaohsiung VGO Hydrotreater Jan 5-Sept 3
    (25,000)
    Taiwan CPC Kaohsiung FCC Jan 5-early Oct
    (25,000)
    Taiwan CPC Kaohsiung No.9 HDS Sept. 12, 1 month
    (20,000)
    Taiwan CPC Kaohsiung No.2 RDS Sep 30-Nov 6
    (30,000)
    Taiwan CPC Dalin No.3 RDS Aug 14-Sep 19
    (30,000)
    Taiwan CPC Dalin No.10 CDU Early Sept, 1 month
    (100,000)
    Taiwan CPC Dalin No.1 RDS Oct 25-Nov 30
    (30,000)
    Taiwan CPC Taoyuan No.2 RDS Jul 16-Aug 23
    (15,000)
    Taiwan Formosa Mailiao No.2 RDS Sep 1, 40 days
    (80,000)
    Taiwan Formosa Mailiao Hydrotreater 2H Jun, one week
    (42,000)
    Taiwan Formosa Mailiao No.2 RFCC Jul 1-10
    (84,000)
    Taiwan Formosa Mailiao No.2 RFCC Jul 14-28
    (84,000)
    Taiwan Formosa Mailiao No. 2 CDU Nov, 36 days
    (180,000)
    Thailand PTTAR Rayong Whole refinery Aug. 21, 28 days
    (145,000)
    Thailand Star Petroleum Whole refinery Nov, 40 days
    (150,000)

    Note:
    TBA – To be announced
    CDU – Crude distillation unit
    FCC – Fluid catalytic cracker
    HDS – Hydrodesulfurizer
    RFCC – Residual fluid catalytic cracker
    RDS – Residual desulfurizer
    <Blue – Existing or Project Coker – CR add>

You must be logged in to reply to this topic.

Refining Community