    Anonymous

    ~ Steam Generation in Decoking

        – Managing feed stock
        – Access management (blue lights, barricade)
        – Manage inlet drum temperature

    ~ Egress

        – All structures egress on opposite ends
        – Smaller structures stand off egress
        – Fire protection both passive and active
        – Safe passage to egress

    ~ Power loss

        – Back up for quench or method to keep channels open
        – Procedure for back up quench failure

    ~ Elevators – Vendor

        – Reliability
        – Correct size and load limit
        – What to do in an emergency/failure

    ~ Un-heading top and bottom head

        – Risk analysis to determine installation of top head valves
        – Top head automation
        – Use drill stem for checking outage