PERSONNEL INFORMATION:
JAYESH P. RANA
DATE OF BIRTH: 24TH JUNE, 1979
ADDRESS: D/14, ANIL PARK PART 2,
BEHIND BRIGHT SCHOOL, VIP ROAD,
KARELIBAUG, VADODARA – 390022
GUJARAT, INDIA.
Telephone : + 919898806635 Mobile : +971505117486
E-mail : jayesh_nan@yahoo.comEDUCATION:
I had completed Associate Member of Indian Institute of Chemical ENGG i.e. I.I.Ch.E (Equivalent to B.E. CHEMICAL) in April 2004.
Diploma in Petrochemical Technology
Maharaja Sayajirao University of Vadodara-1997
Certificate Course of Second Class Boiler Operator.SKILLS/TRAINING:
FIRE , FIRST AID
SAFETY, PERSONNEL PROTECTIVE EQUIPMENT
ECITB/CCNSG SAFETY PASSPORT TRAINING
CHEMICAL HANDLING, TOXIC GAS HANDILING
EMERGENCY HANDELING (FIRE, LEAK, SPILLAGE ETC)
SIMULATOR TRAINING OF DHDS, GAS OIL HYDROTREATING UNIT.
WORK PERMIT SYSTEM
STANDARD OPERATING PROCEDURE OF ALL EQUIPMENT
PRECOMMISSIONING, STARTUP & SHUTDOWN PROCEDURES OF PLANT
UOP LICENCER TRAINING OF SHP, INALK UNIT
AXENS LICENCER TRAINING FOR PRIME G+ PROCESS
FURNACE DESIGN AND OPERATION
PROCESS CONTROL AND INSTRUMENTATION
PROCESS TROUBLESHOOTING & PROBLEM SOLVINGEXPERIENCE:
PANEL/FIELD OPERATION WITH 13 YEARS AND 6 MONTH EXPERIENCE
TAKREER – Abudhabi Oil Refining Co.
Public Company; 1001-5000 employees; Oil & Energy industry
September 2006 Present (5 years 4 months)
Company profile:
ABUDHABI OIL REFINERY COMPANY (TAKREER) having capacity of 85000 BPSD, TAKREER Refinery is Hydro skimming Complex design to refining of Crude oil and Condensate, Supply of Petroleum Product and Production of Granulated Sulphur in Compliance with domestic and international Specification.
Key work Areas:
SULPHUR RECOVERY UNIT:
Capacity : 37 Metric Tons per day
AMINE TREATING UNIT:
Capacity : 16042 KG/HR
GAS OIL HYDROTREATING UNIT:
Capacity: 22500 BPSDJOB RESPONSIBILITIES:
– Looking after all DCS/FIELD operations in SULPHUR RECOVERY UNIT, AMINE TREATING UNIT, and GAS OIL HYDROTREATING UNIT.
– Worked with Instrumentation groups (HONEYWELL) in checking Instrument loops and ESD interlocks and also with in implementing Advanced Process control.
Checking & preparing a plant change scheme which includes basically pressure survey, reviewing the instrumentation & equipment data sheets, adequacy check of relief & piping system of existing systems and their further up gradation as per requirement for trouble free operation.
Preparing daily monitoring report review DCS record and screen, Evaluate trend and result, daily balance of raw material and product. Handling Plant simulation process debottlenecking and process variable. In field Operation Monitor and operate the equipment for safe and efficient operations, Troubleshoot plant operations and take corrective actions, stripping and absorption
Process Upsets handling like foaming in Amine stripper/Amine absorber, hydrogen failure, recycle gas compressor failure, feed pump failure, Power & utility failure, degassing system failure, heater Failure, thermal reactor/incinerator failure.
Suggested innovative Ideas and implemented for Energy Savings, reliability, Safety & Through put increase & its HAZOPS Studies. Done Capacity enhancement through De-bottlenecking of the Existing system.COMMISSIONING SPECIALIST
SOHAR REFINERY COMPANY, LLC, OMAN
September 2005 August 2006 (1 year)
Company profile:
The Sohar refinery company LLC, is the largest government sector organization in Oman. The Sohar refinery company LLC is located away from Muscat (north) . All unit detail engineering by JGC. Distributed Control System for Refinery Complex is of YOKOGAVA CS 3000, JAPAN and is capable of plant wide automation.Key work Areas:
Diesel Hydro desulphurization Unit: Capacity: 30000 BPSD
Technology Provided By UOPGasoline Hydro desulphurization Unit:Capacity: 26500 BPSD Technology Provided By Axens
TSHP unit (Tame Selective Hydrogenation Unit: Capacity : 35000 BPSD
Technology Provided By AxensJOB RESPONSIBILITIES:
Detailed Engineering, Project scheduling, Review of P&ID, PFD, Operating manual, control narratives, Fire and gas Detectors layout, Fire fighting equipment, Cause and effect charts.
Flushing of pipelines by Conventional methods such as Gasket bursting, cardboard blasting, water flushing, Air blowing.
Solo run of motors, Trial run of all types pumps and Compressors,
Prepared a punch list of construction completion, Ready for start up unit.
Instrument loop checking, function test of heaters, compressors.Preparation of catalyst loading of DHDS Reactor and GHDS Reactor.
Precommissioning procedure review, chemical cleaning and passivation of compressor lines.
Non conventional mean such as Slug flushing, Degreasing of heat exchanger, amine lines, Cooling water lines.
Catalyst loading of DHDS Reactor and GHDS Reactor, Refractory & Reactor Catalyst Dry out.
Totally involved in pre-commissioning and commissioning mechanical running test of rotary equipments, Catalyst loading, presulphiding of reactors in DHDS and TSHP/GHDS units.PRODUCTION OPERATOR (FIELD & PANEL)
RELIANCE INDUSTRIES LTD.
Public Company; 10,001+ employees; Retail industry
June 1998 September 2005 (7 years 4 months)
Company profile:
A World largest grassroots integrated refinery & petrochemical Complex having Crude processing capacity of 650 KBPSD.DIESEL HYDROTREATING UNIT
Total 2 train with capacity: 105 KBPSD
VACUUM GAS OIL HYDROTREATING UNIT
Total 2 train with capacity: 110 KBPSDCommissioning Experience:
Besides this I was also involved in following activities during plant pre- commissioning & commissioning phase
Preparing Flushing plans for the smooth and fast precommissioning of the Unit
.Involved in various non conventional flushing, Degreasing of heat exchanger, amine lines, chemical cleaning of compressor lines, punch point list out & rectified
Carried out Refractory Dry out of the heater during the construction phase with all safety issues taken care
Trial run of all pumps and compressors instrumentation alarm/trip system and Logic checking
In reactor catalyst loading , prewetting and sulfiding operation
Checking fire gas detection system and also a fire water deluge system of hot pumps.
Quality Yield Improvement Project of Diesel/VGO Hydro treating Unit to 200 KBPSD.
Project implementation and continuous field operation.JOB RESPONSIBILITIES :
Taking regular rounds of unit to ensure safe operation of the unit
Recording and reporting of field parameter to field engineer and if required to Panel officer.
Monitor the pulse of different equipment in my section mainly the rotating Machines
Hand over and take back of equipment from maintenance as and when required.
Change over of Pumps/Exchangers
Checking of Firebox and burner flame pattern, burner change over and daily Soot blowing in heater
Sampling of various products for laboratory testing.
Ensuring strict compliance with safety procedure, work permit procedure.
Following proper housekeeping to ensure clean and safe work area.
Updating BSC checklists periodically for Safety Audit -
AuthorPosts