~ Valve
– 50/50 preference ball vs. plug
– Good pm program increases life
~ Decoking Valves
– Check Water Quality
– Rebuild Options
~ Drill water Piping/Bypass valves
– Erosion/Corrosion Issues
– Bypass valve reliability
– Instrument air quality
~ Drum Cracking
– Quench procedure
– Good operation and design are key
– Plan for inspection and repair
– Effected by cycle time
– Reduced quench times
– Safety issues (Fires, etc.)
~ Hot Drums
– Quenching time/rates
– Blowouts – Causes
– Caution with using closed type drill guides
~ Drill stem
– Put odd section on the top
– Life limited by cave ins
~ Drill Stem Issues
– Failure Mechanisms
– Corrosion
– Overtorquing
– Outside Contractors
– Trained
– Right Equipment
– Increased Safety
~ Heater Tube
– Failure mechanisms (many)
– Becht has method for checking carburization of the tube
~ Maze Issues
– Water quality
– Fines management
– Pump reliability
– Type of pump – submerged vs. vertical
~ Maze Pumps
– Submersible vs. vertical
– Water handling needs to be properly designed & operated
~ Furnace Changed Pumps
– Need a good warm up procedure
– Be careful cleaning strainers
~ Coke Handling
– Want to avoid cutting rates
– FELS vs Bridge Crane
– Cranes need proper design
~ Elevators
– Freight vs. Passenger
– One facility has no issues
~ PM of emergency equipment
– Fall arrestors
– EBV values