    Table Of Asia Refinery Maintenance Schedules1-28-08 3:25 AM EST

    SINGAPORE -(Dow Jones)- The following table lists maintenance schedules and outages for oil refineries in Asia.
    Additional information will be added as it becomes available. Asia Refinery Maintenance Schedule For 2008
    Country Company Location Unit(B/D) Period/Duration
    Indonesia Pertamina Dumai CDU,at 60% capacity Jan 17-21
    (120,000)
    S Korea SK Energy Ulsan No.5 CDU mid-May, 40 day
    (260,000)
    S Korea Hyundai Daesan No.1 CDU mid-May, 30 days
    (110,000)
    Sri Lanka Ceypetco Sapugaskanda whole refinery Jan 22, 40 days
    (50,000)
    Taiwan CPC Kaohsiung No.6 CDU Oct 26, 2007, TBA
    (100,000)
    Taiwan CPC Kaohsiung VGO Hydrotreater Jan 5, TBA
    (25,000)
    Taiwan CPC Taoyuan RFCC Mid-Dec, 2007 to end-Jan
    (50,000)
    Taiwan CPC Taoyuan HDS Oct 16, 2007 to end-Jan
    (30,000)
    Taiwan Formosa Mailiao delay coker 2H Feb, 8-9 days
    (36,000)
    Taiwan Formosa Mailiao No.1 CDU Mar 10, 40 days
    (180,000)
    Taiwan Formosa Mailiao No.1 RFCC Mar 10, 43 days
    (80,000)
    Taiwan Formosa Mailiao No.1 RDS Mar 10, 43 days
    (80,000)
    Taiwan Formosa Mailiao No. 2 CDU Nov, 40 days
    (180,000)
    Japan Nansei Nishihara CDU Late May-
    (100,000) Early Jun

    Asia Refinery Maintenance Schedule For 4Q, 2007
    Country Company Location Unit(B/D) Period/Duration
    Bangladesh Eastern Chittagong All Units Oct, 2 weeks
    Refinery (33,000)
    China PetroChina Daqing All Units Aug-Oct
    China Sinopec Gaoqiao No.3 CDU Aug 20, 3 months
    China Sinopec Gaoqiao Hydrocracker Sep-Dec
    China Sinopec Guangzhou Hydrocracker Sep-Oct
    China Sinopec Guangzhou No.1 CDU Sep-Oct
    (100,000)
    China Sinopec Shanghai Hydrocracker Sep-Nov
    India HPCL Mumbai All units Oct-Nov
    India MRPL Mangalore Hydrocracker Oct, 30 days
    (120,000)
    S Korea S-Oil Onsan No. 2 CDU Oct 8-Oct 29
    (232,000)
    Taiwan CPC Taoyuan No.2 CDU Nov, 30 days
    (100,000)
    Taiwan Formosa Mailiao No.2 RFCC Nov 27-Dec 4
    (73,000)
    Thailand Thai Oil Sriracha No. 3 CDU Oct 6-Dec 10

    Note:
    TBA – To be announced
    CDU – Crude distillation unit
    FCC – Fluid catalytic cracker
    HDS – Hydrodesulfurizer
    RFCC – Residual fluid catalytic cracker
    RDS – Residual desulfurizer