Home › Forums › Sulfur › Sulfur Equipment, Operations & Process › Sulfur run down lines › RE: Sulfur run down lines
February 5, 2010 at 8:29 am
#5791
One problem we had at the SRU Iworked in was that the condensate drain lines from 3-4 jacketed sections was connected to only ONE steam trap. This arrangement would prevent some of the sections (at least 1) from draining because of the different pressure drops in the system.
Something to keep an eye on while building new SRU’s.
Regards
CG