August 20, 2009 at 2:21 pm
#6025
Anonymous
What about if one valve was much smaller than the other valve. The small valve is what would be opened first, and then once the coke is cool enough, the larger control valve would be opened. Would that be good engineering practice? What if the opening of the valves was a manual procedure?