December 13, 2008 at 7:47 pm
#6407
Anonymous
Every facility should have a set of parameters to determine if a drum is quenched sufficiently to open to the atmosphere. This should include, but not necessarily be limited to, total quench water added to drum, total sour water make, drum pressure, drum temps, etc. However, as an operator, please tell your people to always remember: Opening a drum is a crap shoot. You never know what you will get!