RE: Coke Handling Without Bridge Crane

Home Forums Coking Coke Handling Without Bridge Crane RE: Coke Handling Without Bridge Crane

#5383

Anonymous

Moving tons without your crane will depend on your pit configuration. Are you able to move loaders, dozers, or material handling equipment into your pit. This should have been addressed during the designing phase or with your handling contractor previously; but, now is a good time to discuss with your contractors or personnel what the plan is when your crane goes down in the future, and it will! As for equipment in the pit, you will need to quatinate with operations and most likely monitor for H2S during equipment operations. Hopefully you can get equipment to load into your conveyor hopper or will be able to put in a feed hopper that you can work with.